AIN active was founded in 2003 as a consulting and engineering company with the capacity to provide multidisciplinary technical solutions in the fields of energy, civil, industrial and environmental engineering.
AIN active conducted a feasibility study for the hydroelectric use of the Ivirizu river.
The optimal solution defined is composed of two linked dams: Juntas and Sehuencas, with a total power of 275.73MW.
AIN active has developed the Construction Project for the Costa da Morte Highway works between Carballo and Santa Irene.
AIN active has carried out the works related to the layout, drainage, enclosures and other complementary works in the section between Baio Norte and Berdoias.
The structures planned in this section correspond to 12 overpasses, 7 underpasses and 5 viaducts.
In 2012, AIN active OM was awarded a tender promoted by Gas Natural Fenosa Generación, one of the main operators in the Spanish hydroelectric market.