<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Structures archivos - Ain Active</title>
	<atom:link href="https://ain-active.com/en/area-de-referencia/civil-engineering/structures-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://ain-active.com/en/area-de-referencia/civil-engineering/structures-en/</link>
	<description></description>
	<lastBuildDate>Tue, 15 Apr 2025 15:13:26 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://ain-active.com/wp-content/uploads/2024/04/Proy_Ain_Active_Brandbook_V2-svg-1-svg.svg</url>
	<title>Structures archivos - Ain Active</title>
	<link>https://ain-active.com/en/area-de-referencia/civil-engineering/structures-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Costa Da Morte Highway</title>
		<link>https://ain-active.com/en/referencia/costa-da-morte-highway/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:13:26 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1706</guid>

					<description><![CDATA[<p>AIN active has developed the work for the preparation of the construction project related to the Costa da Morte highway works between Carballo and Santa Irene. Carballo – Baio: dual carriageway with two lanes in each direction over a distance of 25,50 km. Baio – Santa Irene Interchange: single carriageway with one lane in each [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/costa-da-morte-highway/">Costa Da Morte Highway</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="0" data-end="159">AIN active has developed the work for the preparation of the construction project related to the Costa da Morte highway works between <strong>Carballo</strong> and <strong>Santa Irene</strong>.</p>
<ul>
<li data-start="161" data-end="367">Carballo – Baio: dual carriageway with two lanes in each direction over a distance of 25,50 km.</li>
<li data-start="161" data-end="367">Baio – Santa Irene Interchange: single carriageway with one lane in each direction over a distance of 2,20 km.</li>
</ul>
<p class="" data-start="369" data-end="565">Additionally, AIN active has carried out works related to the alignment, drainage, fencing, and other complementary works in the section between <strong>Baio Norte</strong> and <strong>Berdoias</strong>, with a length of 14,21 km.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/costa-da-morte-highway/">Costa Da Morte Highway</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Structural Calculation of the Stormwater Tank in Negreira</title>
		<link>https://ain-active.com/en/referencia/structural-calculation-of-the-stormwater-tank-in-negreira/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:11:42 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1697</guid>

					<description><![CDATA[<p>AIN active has performed the structural calculation and verification of the stormwater tank located in Negreira, on a plot near the facilities of the current E.D.A.R. (Wastewater Treatment Plant) near the Barcala River channel. The stormwater tank consists of the following parts: In-line chamber Off-line retention chamber Relief chamber Roughing chambers Pumping chamber Valve chamber [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/structural-calculation-of-the-stormwater-tank-in-negreira/">Structural Calculation of the Stormwater Tank in Negreira</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="44" data-end="275">AIN active has performed the structural calculation and verification of the stormwater tank located in Negreira, on a plot near the facilities of the current E.D.A.R. (Wastewater Treatment Plant) near the Barcala River channel.</p>
<p class="" data-start="277" data-end="329">The stormwater tank consists of the following parts:</p>
<ul data-start="331" data-end="472">
<li class="" data-start="331" data-end="352">
<p class="" data-start="333" data-end="352">In-line chamber</p>
</li>
<li class="" data-start="353" data-end="385">
<p class="" data-start="355" data-end="385">Off-line retention chamber</p>
</li>
<li class="" data-start="386" data-end="406">
<p class="" data-start="388" data-end="406">Relief chamber</p>
</li>
<li class="" data-start="407" data-end="430">
<p class="" data-start="409" data-end="430">Roughing chambers</p>
</li>
<li class="" data-start="431" data-end="452">
<p class="" data-start="433" data-end="452">Pumping chamber</p>
</li>
<li class="" data-start="453" data-end="472">
<p class="" data-start="455" data-end="472">Valve chamber</p>
</li>
</ul>
<p class="" data-start="474" data-end="793">Regarding the geometry, it has a roughly rectangular footprint with representative exterior dimensions of approximately 33.8 m in length and 20.0 m in width. The height of the walls in the main basin is 6.50 m; 9.0 meters in the roughing chambers, pumping well, and valve chamber; and 3.20 meters in the relief chamber.</p>
<p class="" data-start="795" data-end="860">The modeling was carried out using the Midas Civil 2013 software.</p>
<p class="" data-start="862" data-end="1029">In order to make the behavior of the model as close as possible to that of the actual structure, a 3D model was generated using hybrid rectangular sheet-type elements.</p>
<p class="" data-start="1031" data-end="1107">For the dimensioning of the structure, the following procedure was followed:</p>
<ul data-start="1109" data-end="1620">
<li class="" data-start="1109" data-end="1131">
<p class="" data-start="1111" data-end="1131">Obtaining forces</p>
</li>
<li class="" data-start="1132" data-end="1193">
<p class="" data-start="1134" data-end="1193">Reinforcement dimensioning (Ultimate Limit State &#8211; ULS)</p>
<ul data-start="1109" data-end="1620">
<li class="" data-start="1194" data-end="1223">
<p class="" data-start="1196" data-end="1223">ULS Bending &#8211; Composite</p>
<ul data-start="1109" data-end="1620">
<li class="" data-start="1224" data-end="1262">
<p class="" data-start="1226" data-end="1262">Minimum reinforcement quantities</p>
</li>
<li class="" data-start="1263" data-end="1314">
<p class="" data-start="1265" data-end="1314">Calculation of required bending reinforcement</p>
</li>
</ul>
</li>
<li class="" data-start="1315" data-end="1359">
<p class="" data-start="1317" data-end="1359">Ultimate Limit State (ULS) Shear check</p>
<ul data-start="1109" data-end="1620">
<li class="" data-start="1360" data-end="1449">
<p class="" data-start="1362" data-end="1449">Verification of shear resistance capacity of concrete section without reinforcement</p>
</li>
<li class="" data-start="1450" data-end="1499">
<p class="" data-start="1452" data-end="1499">Calculation of required shear reinforcement</p>
</li>
</ul>
</li>
<li class="" data-start="1500" data-end="1544">
<p class="" data-start="1502" data-end="1544">Serviceability Limit State (SLS) check</p>
<ul data-start="1109" data-end="1620">
<li class="" data-start="1545" data-end="1569">
<p class="" data-start="1547" data-end="1569">SLS Cracking check</p>
</li>
<li class="" data-start="1570" data-end="1620">
<p class="" data-start="1572" data-end="1620">Verification of stresses in foundation slabs</p>
</li>
</ul>
</li>
</ul>
</li>
</ul>
<p>La entrada <a href="https://ain-active.com/en/referencia/structural-calculation-of-the-stormwater-tank-in-negreira/">Structural Calculation of the Stormwater Tank in Negreira</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Expansion of the Do Morrazo Highway &#8211; P.K. 05+360</title>
		<link>https://ain-active.com/en/referencia/expansion-of-the-do-morrazo-highway-p-k-05360/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:10:48 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1685</guid>

					<description><![CDATA[<p>The works for the expansion of the Morrazo Corridor around P.K. 05+300 include the execution of an embankment on a mid-slope, which will be supported laterally by a retaining wall of variable height, exceeding 10.0 meters in some areas. The possibility of replacing this embankment with a mid-slope structure has been considered. On the side [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/expansion-of-the-do-morrazo-highway-p-k-05360/">Expansion of the Do Morrazo Highway &#8211; P.K. 05+360</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="53" data-end="289">The works for the expansion of the Morrazo Corridor around P.K. 05+300 include the execution of an embankment on a mid-slope, which will be supported laterally by a retaining wall of variable height, exceeding 10.0 meters in some areas.</p>
<p class="" data-start="291" data-end="672">The possibility of replacing this embankment with a mid-slope structure has been considered. On the side corresponding to the current roadway, it consists of a support formed by a loader foundation directly on the platform, while on the side corresponding to the expansion, there is a series of rectangular supports and an upper beam that form the support on this side of the deck.</p>
<p class="" data-start="674" data-end="839">AIN Active developed a preliminary analysis of the described structural configuration and carried out the preliminary sizing of the main elements that constitute it.</p>
<p class="" data-start="841" data-end="1266">The proposed structure is formed by a T-beam deck with a double T-section, with a gap between them, and connected at the top by a reinforced concrete slab. The deck support is made on the side of the existing roadway using a loader, and on the opposite side, the support is made on another continuous loader that rests on variable height rectangular supports. The foundation is executed with a foundation base and micropiles.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/expansion-of-the-do-morrazo-highway-p-k-05360/">Expansion of the Do Morrazo Highway &#8211; P.K. 05+360</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
