<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Hydraulic Works archivos - Ain Active</title>
	<atom:link href="https://ain-active.com/en/area-de-referencia/civil-engineering/hydraulic-works/feed/" rel="self" type="application/rss+xml" />
	<link>https://ain-active.com/en/area-de-referencia/civil-engineering/hydraulic-works/</link>
	<description></description>
	<lastBuildDate>Tue, 15 Apr 2025 15:12:14 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://ain-active.com/wp-content/uploads/2024/04/Proy_Ain_Active_Brandbook_V2-svg-1-svg.svg</url>
	<title>Hydraulic Works archivos - Ain Active</title>
	<link>https://ain-active.com/en/area-de-referencia/civil-engineering/hydraulic-works/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>General Collectors and EDAR de O Grove</title>
		<link>https://ain-active.com/en/referencia/general-collectors-and-edar-de-o-grove/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:12:14 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1698</guid>

					<description><![CDATA[<p>The project includes the following actions: Construction of a new pumping station in the current pretreatment building (PUMPING STATION IN PRETREATMENT) Construction of a new pumping section between the pretreatment and Terra de Porto (PUMPING SECTION 1) New pumping well in Terra de Porto (PUMPING IN TERRA DE PORTO) Construction of a new pumping section [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/general-collectors-and-edar-de-o-grove/">General Collectors and EDAR de O Grove</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="44" data-end="91">The project includes the following actions:</p>
<ul data-start="93" data-end="759">
<li class="" data-start="93" data-end="207">
<p class="" data-start="95" data-end="207">Construction of a new pumping station in the current pretreatment building (PUMPING STATION IN PRETREATMENT)</p>
</li>
<li class="" data-start="208" data-end="315">
<p class="" data-start="210" data-end="315">Construction of a new pumping section between the pretreatment and Terra de Porto (PUMPING SECTION 1)</p>
</li>
<li class="" data-start="316" data-end="384">
<p class="" data-start="318" data-end="384">New pumping well in Terra de Porto (PUMPING IN TERRA DE PORTO)</p>
</li>
<li class="" data-start="385" data-end="494">
<p class="" data-start="387" data-end="494">Construction of a new pumping section between Terra de Porto and the headloss point (PUMPING SECTION 2)</p>
</li>
<li class="" data-start="495" data-end="632">
<p class="" data-start="497" data-end="632">Collector from the headloss point to the connection with the existing pumping section from the Meloxo pumping station (COLLECTOR 1)</p>
</li>
<li class="" data-start="633" data-end="695">
<p class="" data-start="635" data-end="695">Inlet collector to the WWTP (Wastewater Treatment Plant)</p>
</li>
<li class="" data-start="696" data-end="719">
<p class="" data-start="698" data-end="719">Submarine outfall</p>
</li>
<li class="" data-start="720" data-end="759">
<p class="" data-start="722" data-end="759">Wastewater Treatment Plant (WWTP)</p>
</li>
</ul>
<p class="" data-start="761" data-end="1138">The treatment plant will process wastewater for an equivalent population of 40.000 inhabitants, with an average inlet flow of 115,5 l/s and a peak treatment flow of 2,25 times the average flow. The maximum permissible flow during rainy periods is 260 l/s. Therefore, a bypass system is planned in the treatment plant to divert excess water to prevent overflow during operation.</p>
<p class="" data-start="1140" data-end="1320">The adopted solution involves biological treatment using activated sludge, with its implementation being influenced by the coastal protection line and the irregularity of the site.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/general-collectors-and-edar-de-o-grove/">General Collectors and EDAR de O Grove</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
