	<title>Power Lines archivos - Ain Active</title>
	<atom:link href="https://ain-active.com/en/area-de-referencia/electric-and-mechanical-engineering/power-lines/feed/" rel="self" type="application/rss+xml" />
	<link>https://ain-active.com/en/area-de-referencia/electric-and-mechanical-engineering/power-lines/</link>
	<description></description>
	<lastBuildDate>Wed, 20 May 2026 09:08:24 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://ain-active.com/wp-content/uploads/2024/04/Proy_Ain_Active_Brandbook_V2-svg-1-svg.svg</url>
	<title>Power Lines archivos - Ain Active</title>
	<link>https://ain-active.com/en/area-de-referencia/electric-and-mechanical-engineering/power-lines/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>La Femosa substation 220 kV</title>
		<link>https://ain-active.com/en/referencia/la-femosa-substation-220-kv/</link>
		
		<dc:creator><![CDATA[Martin]]></dc:creator>
		<pubDate>Wed, 20 May 2026 09:08:24 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=2321</guid>

					<description><![CDATA[<p>Property Engineering and Owner’s Engineering (Engineering Supervision) for a substation in the province of Lleida, comprising two 220 kV line bays and one transformer bay for the grid connection of several photovoltaic installations.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/la-femosa-substation-220-kv/">La Femosa substation 220 kV</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Property Engineering and Owner’s Engineering (Engineering Supervision) for a substation in the province of Lleida, comprising two 220 kV line bays and one transformer bay for the grid connection of several photovoltaic installations.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/la-femosa-substation-220-kv/">La Femosa substation 220 kV</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>66 kV High Voltage Line for the Evacuation of the Xalo Wind Farm</title>
		<link>https://ain-active.com/en/referencia/66-kv-high-voltage-line-for-the-evacuation-of-the-xalo-wind-farm/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:10:44 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1684</guid>

					<description><![CDATA[<p>The High Voltage Evacuation Line for the Xalo Wind Farm consists of a single underground section. General Characteristics Nominal Voltage (kV): 66 Frequency (Hz): 50 Number of Circuits: 1 Maximum Transport Power per Circuit (MVA): 64.003 Total Length (m): 9,820</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/66-kv-high-voltage-line-for-the-evacuation-of-the-xalo-wind-farm/">66 kV High Voltage Line for the Evacuation of the Xalo Wind Farm</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="125" data-end="222">The High Voltage Evacuation Line for the Xalo Wind Farm consists of a single underground section.</p>
<p class="" data-start="224" data-end="251">General Characteristics</p>
<ul data-start="253" data-end="432">
<li class="" data-start="253" data-end="285">
<p class="" data-start="255" data-end="285">Nominal Voltage (kV): 66</p>
</li>
<li class="" data-start="286" data-end="312">
<p class="" data-start="288" data-end="312">Frequency (Hz): 50</p>
</li>
<li class="" data-start="313" data-end="342">
<p class="" data-start="315" data-end="342">Number of Circuits: 1</p>
</li>
<li class="" data-start="343" data-end="400">
<p class="" data-start="345" data-end="400">Maximum Transport Power per Circuit (MVA): 64.003</p>
</li>
<li class="" data-start="401" data-end="432">
<p class="" data-start="403" data-end="432">Total Length (m): 9,820</p>
</li>
</ul>
<p>La entrada <a href="https://ain-active.com/en/referencia/66-kv-high-voltage-line-for-the-evacuation-of-the-xalo-wind-farm/">66 kV High Voltage Line for the Evacuation of the Xalo Wind Farm</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>138 kV Double-Circuit High Voltage Line for the Evacuation of the Matafongo Wind Farm</title>
		<link>https://ain-active.com/en/referencia/138-kv-double-circuit-high-voltage-line-for-the-evacuation-of-the-matafongo-wind-farm/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:10:34 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1683</guid>

					<description><![CDATA[<p>The 138 kV High Voltage Line being projected has a total length of 10,465 meters. The configuration will be a double circuit with DARIEN conductor and ALUMOWELD 7#9 guard wire. General Characteristics Type: Overhead Nominal Voltage (kV): 138 Frequency (Hz): 50 Number of Circuits: 2 Number of Supports: 40 Maximum Transport Power per Circuit (MVA): [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/138-kv-double-circuit-high-voltage-line-for-the-evacuation-of-the-matafongo-wind-farm/">138 kV Double-Circuit High Voltage Line for the Evacuation of the Matafongo Wind Farm</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="43" data-end="219">The 138 kV High Voltage Line being projected has a total length of 10,465 meters. The configuration will be a double circuit with DARIEN conductor and ALUMOWELD 7#9 guard wire.</p>
<p class="" data-start="221" data-end="248"><strong data-start="221" data-end="248">General Characteristics</strong></p>
<p class="" data-start="252" data-end="266">Type: Overhead</p>
<p class="" data-start="269" data-end="294">Nominal Voltage (kV): 138</p>
<p class="" data-start="297" data-end="315">Frequency (Hz): 50</p>
<p class="" data-start="318" data-end="339">Number of Circuits: 2</p>
<p class="" data-start="342" data-end="364">Number of Supports: 40</p>
<p class="" data-start="367" data-end="415">Maximum Transport Power per Circuit (MVA): 158.5</p>
<p class="" data-start="418" data-end="436">Length (m): 10,465</p>
<p class="" data-start="439" data-end="456">Conductor: DARIEN</p>
<p class="" data-start="459" data-end="492">Number of Conductors per Phase: 1</p>
<p class="" data-start="459" data-end="492">Insulation: Polymer</p>
<p class="" data-start="459" data-end="492">Supports: Steel Lattice</p>
<p data-start="459" data-end="492">Foundations: Separate Legs</p>
<p data-start="459" data-end="492">Grounding: Rod and Ring in 2 masses</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/138-kv-double-circuit-high-voltage-line-for-the-evacuation-of-the-matafongo-wind-farm/">138 kV Double-Circuit High Voltage Line for the Evacuation of the Matafongo Wind Farm</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>400/132 kV 4&#215;300 MVA Cerrato Substation Promoters</title>
		<link>https://ain-active.com/en/referencia/400-132-kv-4x300-mva-cerrato-substation-promoters/</link>
		
		<dc:creator><![CDATA[Susana]]></dc:creator>
		<pubDate>Tue, 15 Apr 2025 15:10:14 +0000</pubDate>
				<guid isPermaLink="false">https://ain-active.com/?post_type=referencia&#038;p=1678</guid>

					<description><![CDATA[<p>The renewable division of the Repsol group entrusted AIN Active with the engineering functions of the project ownership for the construction of the Cerrato Substation Promoters. The scope of work included the following tasks: Technical specification for the acquisition of 4 autotransformers of 300 MVA and a 400/132 kV ratio Technical specification for the contracting [&#8230;]</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/400-132-kv-4x300-mva-cerrato-substation-promoters/">400/132 kV 4&#215;300 MVA Cerrato Substation Promoters</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p class="" data-start="43" data-end="220">The renewable division of the Repsol group entrusted AIN Active with the engineering functions of the project ownership for the construction of the Cerrato Substation Promoters.</p>
<p class="" data-start="222" data-end="269">The scope of work included the following tasks:</p>
<ul data-start="271" data-end="656">
<li class="" data-start="271" data-end="372">
<p class="" data-start="273" data-end="372">Technical specification for the acquisition of 4 autotransformers of 300 MVA and a 400/132 kV ratio</p>
</li>
<li class="" data-start="373" data-end="454">
<p class="" data-start="375" data-end="454">Technical specification for the contracting of the Cerrato Substation Promoters</p>
</li>
<li class="" data-start="455" data-end="558">
<p class="" data-start="457" data-end="558">Technical specification for the contracting of the 400 kV connection line to the transmission network</p>
</li>
<li class="" data-start="559" data-end="656">
<p class="" data-start="561" data-end="656">Review of offers, request for clarifications, and preparation of a comparative technical report</p>
</li>
</ul>
<p class="" data-start="658" data-end="866">Once the construction contracts were awarded, a detailed engineering review was carried out for the autotransformers, substation and power line, as well as technical assistance to the property during construction.</p>
<p class="" data-start="868" data-end="917">The facility was commissioned at the end of 2024.</p>
<p>La entrada <a href="https://ain-active.com/en/referencia/400-132-kv-4x300-mva-cerrato-substation-promoters/">400/132 kV 4&#215;300 MVA Cerrato Substation Promoters</a> se publicó primero en <a href="https://ain-active.com/en/">Ain Active</a>.</p>
]]></content:encoded>
					
		
		
			</item>