The renewable division of the Repsol group entrusted AIN Active with the engineering functions of the project ownership for the construction of the Cerrato Substation Promoters.
The scope of work included the following tasks:
-
Technical specification for the acquisition of 4 autotransformers of 300 MVA and a 400/132 kV ratio
-
Technical specification for the contracting of the Cerrato Substation Promoters
-
Technical specification for the contracting of the 400 kV connection line to the transmission network
-
Review of offers, request for clarifications, and preparation of a comparative technical report
Once the construction contracts were awarded, a detailed engineering review was carried out for the autotransformers, substation and power line, as well as technical assistance to the property during construction.
The facility was commissioned at the end of 2024.